Many plants pay monthly bills for wastewater power, chemicals and off-site disposal, yet cannot say what it costs to treat one tonne of wastewater — let alone whether this month was better than last. Operating KPIs turn those scattered numbers into indicators you can compare and track.

Three tests of a good indicator

  1. It tracks cost: when the indicator improves, money should be saved, and vice versa.
  2. It is easy to collect: ideally from existing flow meters, power meters, invoices and operating logs, without building a new system.
  3. It shows trends: expressed per tonne, so production swings don’t hide what is happening month to month.

Suggested core indicators

Indicator Definition Data source
Power per tonne System electricity (kWh) ÷ feed (t) Sub-meter, feed flow meter
Water recovery Acceptable recovered water ÷ feed Recovered-water and feed flow meters
Residue per tonne Concentrate or solids weight ÷ feed Weighbridge tickets
Disposal cost per tonne Off-site disposal and haulage ÷ feed Disposal invoices
Chemicals per tonne Chemical spend ÷ feed Purchasing and usage records
Availability Normal running hours ÷ planned hours Operating log, control system
Cleaning interval Running hours between chemical cleans Maintenance records

The first four together make up most of the cost per tonne treated; the last two are leading indicators that often reveal problems before cost does.

MVR as an example: how the indicators interact

MVR runs mainly on electricity, so power per tonne is the most direct cost indicator. In the example on this site — 10 t/day concentrated to 20% — power use is about 53 kWh/t, water recovery 92.5%, and roughly 0.075 t of residue remains per tonne of waste. For comparison, boiling one tonne of room-temperature water by simple distillation takes about 700 kWh.

The indicators move together:

  • Scaling raises power per tonne and shortens the cleaning interval
  • Lowering the concentration ratio to avoid scaling reduces recovery and raises residue per tonne, which pushes disposal cost up
  • A change in feed quality often shows first in the cleaning interval

A single indicator is easy to misread; look at power, recovery and residue per tonne together.

Setting the baseline

  • New system: average of four consecutive weeks after commissioning has stabilised, recorded together with the feed quality at the time.
  • Existing system: average of the past three months, excluding weeks with abnormal shutdowns.
  • Design values: figures from equipment specifications or assessments make good targets but poor baselines, because real feed often differs from design conditions.

Reset the baseline when feed quality changes significantly — new raw materials or a new process.

Review cadence and presentation

  • Daily: operators watch live values and alarms (power, levels, condensate conductivity).
  • Weekly: supervisors review weekly averages and cleaning intervals to catch trends early.
  • Monthly: management reviews cost per tonne and recovery against budget and production.

One monthly trend chart with a single line explaining this month’s change is often more useful than a long report.

What to bring to a first discussion

  • Three to six months of treatment power, chemical spend, disposal invoices and weighbridge records
  • Feed and recovered-water flow data
  • Cleaning and downtime logs
  • Whether sub-meters or control-system data are available

With these, today’s cost per tonne can be calculated first, and the indicator most worth improving becomes clear.