Many plants pay monthly bills for wastewater power, chemicals and off-site disposal, yet cannot say what it costs to treat one tonne of wastewater — let alone whether this month was better than last. Operating KPIs turn those scattered numbers into indicators you can compare and track.
Three tests of a good indicator
- It tracks cost: when the indicator improves, money should be saved, and vice versa.
- It is easy to collect: ideally from existing flow meters, power meters, invoices and operating logs, without building a new system.
- It shows trends: expressed per tonne, so production swings don’t hide what is happening month to month.
Suggested core indicators
| Indicator | Definition | Data source |
|---|---|---|
| Power per tonne | System electricity (kWh) ÷ feed (t) | Sub-meter, feed flow meter |
| Water recovery | Acceptable recovered water ÷ feed | Recovered-water and feed flow meters |
| Residue per tonne | Concentrate or solids weight ÷ feed | Weighbridge tickets |
| Disposal cost per tonne | Off-site disposal and haulage ÷ feed | Disposal invoices |
| Chemicals per tonne | Chemical spend ÷ feed | Purchasing and usage records |
| Availability | Normal running hours ÷ planned hours | Operating log, control system |
| Cleaning interval | Running hours between chemical cleans | Maintenance records |
The first four together make up most of the cost per tonne treated; the last two are leading indicators that often reveal problems before cost does.
MVR as an example: how the indicators interact
MVR runs mainly on electricity, so power per tonne is the most direct cost indicator. In the example on this site — 10 t/day concentrated to 20% — power use is about 53 kWh/t, water recovery 92.5%, and roughly 0.075 t of residue remains per tonne of waste. For comparison, boiling one tonne of room-temperature water by simple distillation takes about 700 kWh.
The indicators move together:
- Scaling raises power per tonne and shortens the cleaning interval
- Lowering the concentration ratio to avoid scaling reduces recovery and raises residue per tonne, which pushes disposal cost up
- A change in feed quality often shows first in the cleaning interval
A single indicator is easy to misread; look at power, recovery and residue per tonne together.
Setting the baseline
- New system: average of four consecutive weeks after commissioning has stabilised, recorded together with the feed quality at the time.
- Existing system: average of the past three months, excluding weeks with abnormal shutdowns.
- Design values: figures from equipment specifications or assessments make good targets but poor baselines, because real feed often differs from design conditions.
Reset the baseline when feed quality changes significantly — new raw materials or a new process.
Review cadence and presentation
- Daily: operators watch live values and alarms (power, levels, condensate conductivity).
- Weekly: supervisors review weekly averages and cleaning intervals to catch trends early.
- Monthly: management reviews cost per tonne and recovery against budget and production.
One monthly trend chart with a single line explaining this month’s change is often more useful than a long report.
What to bring to a first discussion
- Three to six months of treatment power, chemical spend, disposal invoices and weighbridge records
- Feed and recovered-water flow data
- Cleaning and downtime logs
- Whether sub-meters or control-system data are available
With these, today’s cost per tonne can be calculated first, and the indicator most worth improving becomes clear.