Concentrate Scraped-Surface Dryer

Turn concentrate that is hard to store or haul into a drier, more manageable residue.

Concentrate Scraped-Surface Dryer
  • Concentrate
  • Vapor
  • Residue
Drag to rotate · Schematic illustration, not to scale

Equipment

After evaporation, a concentrated liquid may still be costly to store, transport or hand over for disposal. A scraped-surface dryer keeps the material moving across a heated wall with rotating blades, removing more water and leaving a residue that is easier to package and send to a receiving facility.

50–1,000 L/hThroughput
≈ 10%Moisture of dried solids
1.2 tSteam per tonne of water removed
80%Lower outsourced disposal cost (up to)

Highlights

  • Concentrate-then-dry: pairs with MVR evaporation for zero liquid discharge
  • Electric drive with steam heating
  • Scraper blades keep a thin, moving film to prevent sticking
  • Dried solids are easier to package and hand over

How it works

  1. 01
    Receive concentrate

    Concentrate from an evaporator or process tank is fed in batches or continuously.

  2. 02
    Heat in a thin layer

    Rotating scraper blades spread the material across the heated surface and keep it from sticking.

  3. 03
    Remove vapor

    Evaporated moisture is drawn off and can be condensed and recovered.

  4. 04
    Discharge solids

    The dried residue is discharged for packing and handover to the receiving facility.

Typical applications

  • Evaporator concentrate in zero-liquid-discharge schemes
  • Electroless nickel and other plating concentrates
  • Chemical and agrochemical production residues
  • Small, high-strength streams that are costly to haul as liquid

What to evaluate

  1. Behaviour of the material when heated: stickiness, foaming, crusting
  2. Residual moisture and form the receiving facility will accept
  3. Batch size and frequency
  4. Heat source available on site: electricity, steam or thermal oil
  5. Handling of vapor and odour

Figures are typical values; actual performance depends on feed composition and operating conditions.

Start with your water.

Tell us where the water comes from, how much there is and where it should go next. We will use your brief to frame the first engineering discussion.

Prepare a project brief